FIVE MINUTES CLOSER
Bus-Priority Pilot Evaluation Brief
EXECUTIVE SUMMARY
A 12-week bus-priority pilot on Route 12 reduced peak-period travel times by 18% (5.2 minutes) through dedicated lanes, signal priority, and consolidated stops. Ridership increased 12% while general-traffic delay remained statistically unchanged. The intervention demonstrates that targeted priority measures can meaningfully improve transit competitiveness without penalizing other modes, with equity gains concentrated in historically underserved corridor segments.
ROUTE 12 CORRIDOR — BEFORE / AFTER
BEFORE
AFTER
Dedicated bus lane
Mixed traffic
Stop (before)
Stop (after)
Signal priority
Queue jump
PEAK TRAVEL-TIME COMPARISON
Source: AVL/APC data, 12-week pilot vs. 12-week baseline. Weather-normalized. Error bars ±1σ. n=48 weekdays.
EQUITY IMPACT
Ridership gains highest in Q1 (lowest-income) corridor segments: +22% vs. +8% in Q4. Travel-time savings per rider: 6.1 min (Q1) vs. 4.3 min (Q4).
Priority investments concentrated in segments with highest transit-dependent populations. Consolidated stops maintained 95% coverage within ¼-mile walkshed. No displacement of paratransit or loading zones observed.
RECOMMENDATIONS
1. Make Route 12 priority treatments permanent. Extend dedicated lanes to remaining 40% of corridor; upgrade TSP to adaptive logic.
2. Replicate corridor-level priority on Routes 7, 19, and 33 within 18 months. Use Route 12 as design standard with context-sensitive stop spacing.
3. Establish corridor performance dashboard with real-time travel-time reliability, ridership equity index, and general-traffic spillover metrics. Report quarterly.
METHODOLOGY
Difference-in-differences design comparing Route 12 (treatment) to Routes 8 & 15 (controls) over 12-week pilot vs. 12-week baseline. Primary outcome: scheduled vs. actual runtime at 5-min resolution from AVL. Secondary: APC ridership, Bluetooth travel-time for general traffic, onboard survey (n=1,240). Weather and event-day controls applied. Significance at p<0.05.
SOURCES
Transit Agency AVL/APC System • Regional Travel Model v4.2 • Onboard Survey Instrument 2024 • Census ACS 2022 5-yr (tract-level) • Pilot Operations Log