Team workshop · 60 min
MAKE IT CIRCULAR

Six gates before a garment becomes waste.

An 8-slide decision sprint for apparel product teams
Supporting visual for Opening title slide that sets the workshop tone, states the six-gate promise, and shows duration. Supporting visual for Opening title slide that sets the workshop tone, states the six-gate promise, and shows duration.
Slide 02 · decision map

Move through every gate

06
DESIGN → USE → NEXT USE
01Fiber choice
02Construction
03Trim compatibility
04Repair
05Disassembly
06End-of-use routing
Gate 01

Fiber choice: start with the next system

01

Ask for verified composition, origin and pathway.

CottonPETElastane
Body: CottonGoodLimitAvoid
Body: PETLimitGoodLimit
Trim: CoatingPoorPoorAvoid
Workshop: Which blend can you remove without losing the brief?
Supporting visual for Gate 01 – Fiber choice: material compatibility matrix and verified-composition prompt.
Gate 02

Construction: fewer barriers, longer life

02
GOOD · accessible seams
Collar
Body
Sleeve
Sleeve

Standard stitch, spare allowance, replaceable panels.

POOR · permanent fusion
Collar
Body
Sleeve
Sleeve

Bonded layers block repair and material recovery.

Supporting visual for Gate 02 – Construction: side-by-side good vs poor exploded garment views.
Gate 03

Trim compatibility

03
Match

Use same-family labels, thread and closures where possible.

Minimize

Reduce trim count, finishes and decorative composites.

Mark

Identify unavoidable materials and removal points.

Workshop: Circle every trim that has no function.
Gate 04

Repair is a product feature

04
1Predict failure zones
2Reinforce or modularize
3Provide parts and instructions
4Test real repair time
Prompt: Can a local tailor restore this in under 20 minutes?
Gates 05 + 06

Disassemble, then route

05—06
Collar
Body
Sleeve
Sleeve
pull tab
remove
remove
recover
1
Reuse
2
Repair
3
Remake
4
Recycle
Name the receiver, quality threshold and collection route—not just “recyclable.”
Slide 08 · photograph this

Release checklist

STOP / GO