01
Great Pyramid of Giza
Materials & Tools
- 1Leveling limited cumulative error.
- 2Limestone formed the main mass.
- 3Granite served the burial chamber.
- 4Copper tools worked softer stone.
- 5Exact lifting and ramp systems remain debated.
Four sectional studies of construction, drainage, river control, and gravity-fed conveyance. Dates are approximate; the pyramid ramp remains debated.
| Work | Approx. date | Core engineering idea | Key constraint |
|---|---|---|---|
| Great Pyramid | c. 2560 BCE | Align, haul, and place stone | Mass and placement accuracy |
| Mohenjo-daro drainage | c. 2500 BCE | Covered gravity drainage | Solids and maintenance |
| Dujiangyan | begun c. 256 BCE | Divide and regulate river flow | Floods and sediment |
| Pont du Gard | c. 50 CE | Carry gravity flow over a valley | Height and gentle fall |